Skip to content
Built2Bid
Code search
Local Verification NeededVerifiedState amendment (amended R703.7)

Minn. R. 1309.0703, subp. 3: Section R703, Exterior Covering: IRC Section R703.7

Minnesota Rules › Chapter 1309 › 1309.0703 Section R703, Exterior Covering

Verified at the state or federal level. Your local permitting office may adopt or amend it differently. Choose a state to check applicability.

Applicability shown for federal rules only (no state chosen).

Official text (excerpt)

Subp. 3. IRC Section R703.7. Section R703.7 is amended to read as follows: R703.7 Exterior plaster. Installation of these materials shall be in compliance with ASTM C 926 and ASTM C 1063 and provisions of this code. R703.7.1 Lath. All lath and lath attachments shall be of corrosion-resistant materials. Expanded metal or woven wire lath shall be attached with 11 gage nails having a 7/16-inch (11.1 mm) head or 16 gage staples, spaced at no more than 6 inches (152 mm) or as otherwise approved. Nails or staples shall penetrate wood framing support members not less than 3/4-inch (19 mm). R703.7.1.1 Control joints and expansion joints. Provisions for the control of expansion shall be determined by the exterior plaster application designer. ASTM C 1063 Sections 7.11.4 - 7.11.4.4 do not apply. R703.7.2 Plaster. Plastering with portland cement plaster shall be in accordance with ASTM C926. Cement materials shall be in accordance with one of the following: 1. Masonry cement conforming to ASTM C91 Type M, S, or N. 2. Portland cement conforming to ASTM C150 Type I, II, or III. 3. Blended hydraulic cement conforming to ASTM C595 Type IP, IS (<70), IL, or IT (S < 70). 4. Hydraulic cement conforming to ASTM C1157 Type GU, HE, MS, HS, or MH. 5. Plastic (stucco) cement conforming to ASTM C1328. Plastering with portland cement plaster shall be not less than three coats when applied over metal lath or wire lath and shall be not less than two coats when applied over masonry, concrete, pressure-preservative treated wood, or decay-resistant wood as specified in Section R317.1 or gypsum backing. If the plaster surface is completely covered by veneer or other facing material or is completely concealed, plaster application need be only two coats, provided the total thickness is as set forth in Table R702.1(1). On wood-frame construction with an on-grade floor slab system, exterior plaster shall be applied to cover, but not extend below, lath, paper, and screed. R703.7.2.1 Weep screeds. A minimum 0.019-inch (0.5 mm) (No. 26 galvanized sheet gage), corrosion-resistant weep screed or plastic weep screed, with a minimum vertical attachment flange of 3-1/2 inches (89 mm) shall be provided at or below the foundation plate line on exterior stud walls in accordance with ASTM C 1063. The weep screed shall be placed a minimum of 4 inches (102 mm) above the earth or 2 inches (51 mm) above paved areas and shall be of a type that will allow trapped water to drain to the exterior of the building. The weather-resistant barrier shall lap the attachment flange. The exterior lath shall cover and terminate on the attachment flange of the weep screed. R703.7.3 Water-resistive barriers. Water-resistive barriers shall be installed as required in Section R703.2 and, where applied over wood-based sheathing, shall include two layers of a water-resistive vapor-permeable barrier. Each layer shall meet both of the following requirements: 1. A water resistance of not less than that of 60-minute Grade D paper; or a minimum hydrostatic head of 23-31/32 inches (60.9 cm) when tested in accordance with hydrostatic pressure test method AATCC 127-2008; or a minimum water transudation time of 60 minutes when tested in accordance with ASTM D-779. 2. A water vapor permeance of not less than that of No. 15 felt; or a minimum permeance rating of 8.5 gr/h.ft. 2 in Hg (US perm) (4.9 x 10 10 kg/Pa.s.m 2 ) when tested in accordance with Procedure B of ASTM E96. Exception: One layer of water-resistive barrier complying with R703.2 is permitted when a drainage space that allows bulk water to flow freely behind the cladding is provided. R703.7.4 Application. Each coat shall be kept in a moist condition for at least 48 hours prior to application of the next coat. Exception: Applications installed in accordance with ASTM C 926. The second coat is permitted to be applied as soon as the first coat has attained sufficient rigidity to receive the second coat. R703.7.5 Curing. The finish coat for two-coat cement plaster shall not be applied sooner than seven days after application of the first coat. For three-coat cement plaster, the second coat shall not be applied sooner than 48 hours after application of the first coat, except as required in Section R703.7.4. The finish coat for three-coat cement plaster shall not be applied sooner than seven days after application of the second coat.

Source

Publication
Minnesota Rules, chapter 1309: Adoption of the International Residential Code
Edition
2020 Minnesota State Building Code
Publisher
Minnesota Department of Labor and Industry (Office of the Revisor)
Section
Minn. R. 1309.0703, subp. 3
Page
Online rule: cite by part and subpart; there are no page numbers.
Effective
Mar 31, 2020
Last verified
Nov 22, 2026
Rights
Official government text (law). Official text of Minnesota Rules (state law) from the Office of the Revisor. Built2Bid shows short per-subpart excerpts of Minnesota's own amendments with the citation and a link. The incorporated ICC model code text is not reproduced.

Verification history

  • Nov 22, 2026 · Section: Read in the official publication, verified · source
  • Nov 22, 2026 · Publication: Read in the official publication, verified · source
Report a problem

Educational information only. Building codes and licensing requirements vary by jurisdiction and may change. Verify requirements with the applicable authority having jurisdiction before beginning work.